מאמרים ותחומי עניין אקדמיים של איציק כהן


Izack Cohen   עודכן בדצמבר 2016

בעברית

איציק כהן, שיטות דרוג המקומות, חוכמת ההמונים ואיך אתם יכולים להשפיע על הדרוג?

באנגלית

Katsman, A., Ginzburg, A., Werber, T., Cohen, I., & Levin, L. (2000). Nickel–aluminide coating of TiAl by a two-stage process. Surface and coatings technology, 127(2), 219-222.‏‏

Cohen, I., Mandelbaum, A., & Shtub, A. (2004). Multi-project scheduling and control: A process-based comparative study of the critical chain methodology and some alternatives. Project management journal, 35, 39-49.‏

Cohen, I., Golany, B., & Shtub, A. (2005). Managing stochastic, finite capacity, multi-project systems through the cross-entropy methodology. Annals of Operations Research, 134(1), 183-199.‏

Cohen, I., Golany, B., & Shtub, A. (2007). The stochastic time–cost tradeoff problem: a robust optimization approach. Networks, 49(2), 175-188.‏

Cohen, I., Golany, B., & Shtub, A. (2007). Resource allocation in stochastic, finite-capacity, multi-project systems through the cross entropy methodology. Journal of Scheduling, 10(3), 181-193.‏

Cohen, I. (2008). Improving time-critical decision making in life-threatening situations: Observations and insights. Decision Analysis, 5(2), 100-110.‏

Kossoy, E., Khoptiar, Y., Cytermann, C., Shemesh, G., Katz, H., Sheinkopf, H.,Cohen, I., & Eliaz, N. (2008). The use of SIMS in quality control and failure analysis of electrodeposited items inspected for hydrogen effects. Corrosion Science, 50(5), 1481-1491.‏

Cohen, I. (2008). Improving time-critical decision making in life-threatening situations: Observations and insights. Decision Analysis, 5(2), 100-110.‏

Cohen, I. (2010). Kaizen and stochastic networks support the investigation of aircraft failures. Interfaces, 40(3), 208-221.‏

Kroese, D. P., Rubinstein, R. Y., Cohen, I., Porotsky, S., & Taimre, T. (2013). Cross-entropy method. In Encyclopedia of Operations Research and Management Science (pp. 326-333). Springer US.‏

Cohen, I., Iluz, M., & Shtub, A. (2014). A simulation‐based approach in support of project management training for systems engineers. Systems Engineering, 17(1), 26-36.‏

Cohen, I., Mandelbaum, A., & Zychlinski, N. (2014). Minimizing mortality in a mass casualty event: fluid networks in support of modeling and staffing. IIE Transactions, 46(7), 728-741.‏

Iluz, M., Cohen, I., & Shtub, A. (2014). Integration management: Learning to see the big picture. The Voice of the Systems, 14, 27-40.

Tzimerman, A., Dery, L., Balouka, N. S., Cohen, I., Herer, Y. T., & Shtub, A. (2014). Simulation-Based Education in Supply Chain and Project Management.‏

Cohen, I. (2015). Integrating traditional and innovative value-focused models in project management teaching. The Journal of Modern Project Management, 2(3).‏

Cohen, I., & Globerson, S. (2015). The Impact of Debriefing on Future Performance of Projects. International Journal of Operations and Logistics Management, 4(3), 177-192.‏

Cohen, I., & Iluz, M. (2015). When cost–effective design strategies are not enough: Evidence from an experimental study on the role of redundant goals. Omega, 56, 99-111.‏

Balouka, N., Cohen, I., & Shtub, A. (2016). Extending the Multimode Resource-Constrained Project Scheduling Problem by Including Value Considerations. IEEE Transactions on Engineering Management, 63(1), 4-15.‏

Globerson, S., Vardi, S., & Cohen, I. (2016). Identifying the Criteria Used for Establishing Work Package Size for Project WBS. The Journal of Modern Project Management, 4(1).‏